Off-plan payment plans in Dubai explained: 60/40, 70/30 and post-handover
What the common payment-plan formats mean, how post-handover plans work, and how to compare plans between projects fairly.
By 52Gaz · 2 November 2026
A payment plan is the schedule on which you pay for an off-plan home. Developers market them heavily, and for good reason: they decide how much cash you need and when. Reading them correctly is a skill worth having.
How to read the numbers
A plan written as 60/40 means 60% of the price is paid during construction and 40% on handover. A 70/30 plan front-loads more; an 80/20 plan asks for most of the money before you receive the keys. Many launches also carry a down payment of 10% to 20% on signing, included in the first figure.
Common formats
- Construction-linked plans: instalments tied to building milestones such as completion of a floor level or the structure.
- Date-based plans: instalments due on fixed dates, for example every three or six months.
- Post-handover plans: a share of the price, often 20% to 40%, is paid in instalments after you receive the keys, sometimes over several years.
Why post-handover plans are popular
They let you rent the unit out while still paying for it, which can ease cash flow. The trade-off is that the overall price is sometimes higher than on a comparable standard plan, and you carry a payment obligation on a finished property. Check whether the price differs between plan options for the same unit.
How to compare plans fairly
- Convert each plan into cash needed per year until handover.
- Compare the price per square foot, not only the instalments.
- Check what is due at handover, including fees you pay on top of the price.
- Ask whether the plan is the same for every unit type or only for selected ones.
Our project directory lists the plan for each project where the developer has published it, and we can confirm the current plan for any unit on request.
A word of caution
A comfortable payment plan reduces the pressure on your wallet; it does not change the value of the unit. Judge the location, developer and price first, and the plan second.
Frequently asked questions
What does 60/40 mean in a payment plan?
It means 60% of the price is paid during construction and 40% at handover. Other common splits are 70/30 and 80/20.
Is a post-handover payment plan better?
It depends on your cash flow. It spreads the cost after you receive the keys but can come with a higher total price or a payment obligation on a finished home. Compare it with the standard plan for the same unit.
Can the payment plan change after I sign?
The schedule is fixed by the SPA you sign. Changes require an agreed amendment, so confirm the final plan in writing before signing.